🔴 CI failed: check #23

Closed
opened 2026-08-25 23:35:24 +00:00 by plat · 1 comment
Owner

The check workflow failed on feat/design-lint-ci at bf850516e0 (run 23379).

Diagnose with get_build (it returns failure logs). If it's a transient infra flake (truncated download, registry hiccup, timeout), retry_build and verify it goes green. If it's a real failure, fix it on a branch and open a PR as usual.

The `check` workflow failed on `feat/design-lint-ci` at `bf850516e0` (run 23379). Diagnose with `get_build` (it returns failure logs). If it's a transient infra flake (truncated download, registry hiccup, timeout), `retry_build` and verify it goes green. If it's a real failure, fix it on a branch and open a PR as usual.
Author
Owner

Closing: the branch was merged (#22) and main is green; the failure it funneled is history.

Closing: the branch was merged (#22) and main is green; the failure it funneled is history.
plat closed this issue 2026-08-26 01:49:38 +00:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
open-platform/app-template#23
No description provided.