A domain's proof is asked of the authority every time #8

Merged
plat merged 1 commit from trevato/main into main 2026-09-29 02:53:53 +00:00
Owner

1 commit ahead of trevato/forge-upstream, proposed from trevato/forge's following card.

- A domain's proof is asked of the authority every time (trevato/forge#328) 1 commit ahead of trevato/forge-upstream, proposed from trevato/forge's following card.
A domain's proof is asked of the authority every time (#328)
Some checks failed
sync-env / sync-env (push) Successful in 2s
check / check (pull_request) Failing after 1m15s
check / check (push) Failing after 1m15s
preview / preview (pull_request) Successful in 3m17s
release / build (push) Successful in 3m15s
450aebd6d7
plat merged commit 450aebd6d7 into main 2026-09-29 02:53:53 +00:00
Contributor

🔴 check is red at 450aebd6d7 (fix round 1/3). Fix it on this branch: run bun run check locally (lint, typecheck, build, tests, design conformance — the same job CI runs), push, and the review resumes when it is green. The head on origin is what gets reviewed.

🔴 `check` is red at `450aebd6d7` (fix round 1/3). Fix it on this branch: run `bun run check` locally (lint, typecheck, build, tests, design conformance — the same job CI runs), push, and the review resumes when it is green. The head on origin is what gets reviewed.
Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
2 participants
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
trevato-apps/forge!8
No description provided.