WIP: preview — apps worktree #2

Closed
plat wants to merge 4 commits from apps-preview into main
Contributor

Point-in-time snapshot of the apps worktree (uncommitted work by another agent) merged with main, so it can be seen live at its own preview URL.

Not for merging: WIP keeps it unmergeable. Refresh by re-snapshotting the worktree onto apps-preview and pushing.

This branch also carries .forgejo/workflows/preview.yml, which gives every pull request a web-only forge at https://pr-<N>-forge-trevato-apps.open-platform.sh (SSH stays with prod).

Point-in-time snapshot of the `apps` worktree (uncommitted work by another agent) merged with `main`, so it can be seen live at its own preview URL. Not for merging: WIP keeps it unmergeable. Refresh by re-snapshotting the worktree onto `apps-preview` and pushing. This branch also carries `.forgejo/workflows/preview.yml`, which gives every pull request a web-only forge at `https://pr-<N>-forge-trevato-apps.open-platform.sh` (SSH stays with prod).
Author
Contributor

🔴 check is red at b532b0ce04 (fix round 1/3). Fix it on this branch: run bun run check locally (lint, typecheck, build, tests, design conformance — the same job CI runs), push, and the review resumes when it is green. The head on origin is what gets reviewed.

🔴 `check` is red at `b532b0ce04` (fix round 1/3). Fix it on this branch: run `bun run check` locally (lint, typecheck, build, tests, design conformance — the same job CI runs), push, and the review resumes when it is green. The head on origin is what gets reviewed.
Author
Contributor

⬆️ Escalating to opus after 1 failed round on claude-opus-5.

⬆️ Escalating to **opus** after 1 failed round on claude-opus-5.
Author
Contributor

🔄 worker working… #2 · 7m elapsed · ~19 steps

last action: Bash

Typecheck is clean. Now the test suite (the other half of check):

Live progress — updates while the agent runs; replaced by the final summary on completion.

<!-- plat-agent-heartbeat --> 🔄 **worker working…** #2 · 7m elapsed · ~19 steps last action: `Bash` > Typecheck is clean. Now the test suite (the other half of `check`): *Live progress — updates while the agent runs; replaced by the final summary on completion.*
plat added spent time 2026-09-06 05:04:28 +00:00
7 minutes 38 seconds
Author
Contributor

Preview only. The crew is paused for this org; the fix-it worker that started on this WIP snapshot was stopped. Live at https://pr-2-forge-trevato-apps.open-platform.sh

Preview only. The crew is paused for this org; the fix-it worker that started on this WIP snapshot was stopped. Live at https://pr-2-forge-trevato-apps.open-platform.sh
Author
Contributor

Superseded: the apps work is merged on main and ships as v0.2.0. Closing tears the preview down.

Superseded: the apps work is merged on main and ships as v0.2.0. Closing tears the preview down.
plat closed this pull request 2026-09-06 23:56:34 +00:00
Some checks failed
check / check (pull_request) Failing after 12s
preview / preview (pull_request) Successful in 1s

Pull request closed

Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
1 participant
Notifications
Total time spent: 7 minutes 38 seconds
plat
7 minutes 38 seconds
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
trevato-apps/forge!2
No description provided.