gate: germination timeout 40m → 55m (parallel-capacity contention) #86

Merged
plat merged 1 commit from fix/germinate-timeout-contention into main 2026-07-02 19:48:56 +00:00
Owner

Run 30 (PR #85 gate) was Terminated at the 40m step timeout with the daughter's agents chart build still healthily running — capacity-2 parallelism stretches the in-dind build phase past the idle-host calibration. 55m + 20m gate fits the 110m job cap. Evidence: vxrail ~/ci-gate-logs/run30-up.log.

🤖 Generated with Claude Code

Run 30 (PR #85 gate) was Terminated at the 40m step timeout with the daughter's agents chart build still healthily running — capacity-2 parallelism stretches the in-dind build phase past the idle-host calibration. 55m + 20m gate fits the 110m job cap. Evidence: vxrail ~/ci-gate-logs/run30-up.log. 🤖 Generated with [Claude Code](https://claude.com/claude-code)
gate: germination timeout 40m -> 55m (parallel-capacity contention)
All checks were successful
coldstart / coldstart (pull_request) Successful in 18m14s
6a657dd5c9
Run 30 was Terminated at the 40m step timeout while the daughter's agents
chart build was still healthily running — two concurrent germinations
(capacity 2) stretch the in-dind build phase past the idle-host calibration.
55m + 20m gate fits the 110m job cap.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
plat merged commit b94f973f4d into main 2026-07-02 19:48:56 +00:00
Sign in to join this conversation.
No description provided.